Project Portfolio

Asset Inventory Analysis

City of Statesville

The City of Statesville is experiencing growth in its sanitary sewer customer base while much of its existing infrastructure approaches the end of its design life. Gavel & Dorn is conducting an inflow and infiltration study of the City’s Third Creek and Fourth Creek sewer basins to identify wet weather flow sources and develop a prioritized rehabilitation capital plan. The project combines temporary flow monitoring at 24 locations, rainfall monitoring, storm response analysis, manhole inspections, smoke testing, and review of City-provided sewer CCTV inspections. Flow monitoring results guided the selection of four priority investigation areas encompassing approximately 1,100 manholes. Gavel & Dorn incorporated AI tools into our sanitary sewer assessment workflow. AI is primarily used to code manhole inspections per MACP based on review of associated inspection videos. Engineering staff review 100% of all manhole and pipe inspection videos prior to making final recommendations.

Meadows Pump Station Force Main Rehabilitation

Town of Stanley

The Meadows Pump Station Force Main system had experienced repeated failures and capacity concerns following its reinstatement. The Gavel & Dorn team conducted field investigations, utility coordination, and flow metering to assess existing conditions and system performance. Hydraulic modeling of the pump station, force main, and downstream gravity sewer was completed to quantify available capacity and evaluate the system’s ability to support future growth. Based on these analyses, Gavel & Dorn developed a Preliminary Engineering Report and advanced the project through design, permitting, and preparation of construction documents. Services also included bidding support and construction phase services, including inspection and materials testing.

Various Geotechnical, Construction Materials Testing, and Special Inspection Services

City of Charlotte

Gavel & Dorn provided construction materials testing on backfilled soils, concrete, asphalt, and existing subgrade, as well as construction inspection services and special inspections on reinforced concrete for this open-ended contract, which included 31 projects. The projects were varied and included replacing an existing culvert with a double box culvert, resurfacing projects, road widening projects, and installation of new concrete sidewalk and driveways. These projects consisted of night work, work in heavily trafficked areas, and construction within the NCDOT right-of-way.

Sanitary Sewer Master Plan – Coddle Creek Modeling Effort

Water and Sewer Authority of Cabarrus County

Gavel & Dorn, a subconsultant for this WSACC Sanitary Sewer Master Plan project, was tasked with developing a hydrologic/hydraulic model of the trunk sewer along Coddle Creek. The model was built with the InfoWorks ICM software platform using various sources of data to define the manhole and pipeline physical properties. The updates consisted of incorporating the latest survey and GIS information into the existing conditions model, incorporating the latest drawings of the parallel relief interceptor into the future conditions model, recalibrating the model with more recent flow metering and rainfall data to be collected as part of the Master Plan, and running the model under updated population projections. Gavel & Dorn also designed a parallel relief interceptor in the modeling area.

McMullen Creek Tributary at Quail Hollow Sanitary Sewer Replacement

Charlotte Water

This design-build project included a comprehensive study of the existing sewer, including additional SSES and hydraulic modeling of the sewer system. Because much of the existing sewer ran through Quail Hollow Club, a PGA championship course, Gavel & Dorn worked with the contractor to determine areas where trenchless construction could be applied to minimize impacts to the golf course, environmental features, and residential properties. Communication was critical during project implementation and included public notices, informational mailers, and public meetings. Construction included 4,100 LF of new 12- and 16-inch sanitary sewer and over 3,000 LF of CIPP lining of existing sewer.

Cedars East Storm Drainage Improvement Project

Charlotte Storm Water Services

Gavel & Dorn provided construction management and inspection services for this project that addressed flooding and aging infrastructure in an area on the east side of Charlotte, NC that had experienced significant development expansion. The completed project consisted of extensive utility coordination and relocation, approximately 2,300 linear feet of box culvert, over 1,800 linear feet of sanitary sewer installation/relocation, over 1,200 linear feet of stream stabilization, and almost 3,000 live stake plantings. Gavel & Dorn's notable contributions to the project included thorough documentation and site management, maintaining access for residents within the narrow corridor, and responding to Hurricane Florence by implementing robust emergency erosion and sediment control measures. The project received the 2022 APWA North Carolina Stormwater Project of the Year Award.

Elevated Water Storage Tank

Town of Harrisburg

Gavel & Dorn provided design and construction services for a new 1-million-gallon elevated storage tank, which the Town needed to support demand growth and comply with State water system regulations. The scope of work included preliminary design, subsurface investigations, hydraulic modeling, final design, permitting, bidding, and construction phase services including reinforcing, welding, and coatings special inspections. The Town selected a composite-type tank that was more aesthetically appealing. Design also included 600 LF of 16-inch water main installed via jack-and-bore under NCDOT-maintained Rocky River Road.

Harrisburg water tank above the surrounding woodland

Hechenbleikner Lake Dam Repair

The University of North Carolina at Charlotte

Hechenbleikner Lake has been a centerpiece of the main entrance to the UNCC main campus since it was built more than 50 years ago. The busy primary campus entrance road is located along the crest of the dam. When the corrugated metal pipe spillway within the dam failed, UNCC was forced to drain the lake to save the roadway and critical infrastructure such as a water main, steam line, power duct bank, and communication and irrigation lines. Gavel & Dorn provided engineering services for the design, permitting, and construction of repairs to the dam. The project also included correction of failed pavers at the traffic circle, repairs to University Road, construction of new ADA-compliant parking, and significant landscaping and lighting improvements.

Field project photo